G. Douglas Vallee Limited is currently working on the Pyle Driveway Bridge deck replacement near Lowbanks, Ontario. Prior to construction, the superstructure showed signs of severe deterioration and the structure had a load restriction implemented. The deck has now been replaced with a prefabricated steel superstructure. This approach revitalizes the structure while using the existing abutments, and minimizes bridge closure time. Through this process, the bridge was out-of-service for only 34 hours! Construction is now complete, and the bridge is open for use.