News

  • Project Award: Beachville Fire Station

    The team at G. Douglas Vallee Limited is proud to have been awarded the role of Architect, Structural Engineer, Civil Engineer and Prime Consultant for the new Beachville Fire Station located in the Township of South-West Oxford.
     
    This project is a fantastic application of Vallee’s extensive fire hall design experience. It is anticipated that this will be another sustainable building by Vallee with energy efficiency design and the goal of a Net Zero Energy being implemented.

  • Port Dover Health Centre Public Open House

    John Vallee and Michael Higgins of G. Douglas Vallee Limited recently attended a public open house for the proposed Port Dover Health Centre. Also present were board members for the Centre and Norfolk County officials. Architectural and Engineering drawings of the 17,000 square-foot structure were on display giving citizens the opportunity to see the proposed building plan.

  • Saint John The Divine Church Addition

    Sunday June 26, 2016 marked the much-anticipated ribbon cutting event for the new addition to Saint John the Divine Church in Cayuga, Ontario. After a short dedication ceremony the building was open to the public. The new two-level addition includes an elevator, an office and accessible washrooms on each floor.  
     
    As the Architect and Prime Consultant of the project, G. Douglas Vallee Limited incorporated modern amenities into the building while keeping the exterior design complimentary to the original style of the 1896 stone church.

  • Hoy’s Restaurant Opening

    Vallee recently attended the ribbon-cutting ceremony and official re-opening of the newly renovated Hoy’s Restaurant in Simcoe, Ontario. Also in attendance at the ribbon cutting were Tony Yin (co-owner), representatives from Prominent Homes (contractor) and Mayor Charlie Luke. Our Architectural team at G. Douglas Vallee Limited enjoyed being a part of this project. Congratulations to Tony Yin and the team at the new Hoy’s Restaurant!

  • Vallee Awarded Norfolk County Bridge Engineer Contract

    G. Douglas Vallee Limited is very pleased to announce that we have been awarded the five-year contract with Norfolk County for bridge engineering services. We are excited to provide the highest quality engineering services to the Municipality for another term.

  • Contributing to Fort McMurray

    G.D. Vallee Limited recently matched employee donations to the Red Cross in the wake of the Fort McMurray, Alberta fires for a total of $440, an amount that will be matched by the Federal Government. The recent fires are a national tragedy and we are pleased to be able to contribute to the Fort McMurray community.

  • Engineer-of-Record To Haldimand County

    G. Douglas Vallee Limited is pleased to announce that we have accepted the position of Engineer-of-Record to Haldimand County for their bridges for an unprecedented consecutive second term! We have enjoyed a great working experience with Haldimand staff and residents, and look forward to serving through 2020.

  • Greenfield Dental Office Grand Opening

    Vallee is proud to have served as the Prime Consultant for the development of the new 5,000-square-foot Greenfield Dental building located on Colborne Street in Simcoe, Ontario. This new dental building reflects both a commitment to the community and revitalization of Simcoe’s downtown core.

  • Sustainable Fire Station Engineering

    Coldstream Fire Station
    G. Douglas Vallee Limited is currently active on a unique project for
    Middlesex Centre.  This municipality is
    very progressive regarding sustainable design and construction of buildings.
    With this goal in mind, Vallee has the role of Project Manager and Prime
    Consultant for the proposed fire hall in the community of Coldstream. Working
    with our team of specialty designers and sustainability experts, the Vallee
    team is working towards the design of a truly sustainable fire hall.

    It is our goal to design a truly Net Zero Energy / Carbon Neutral Fire Station.  This means that over the course of a year,
    the building will generate an amount of energy equal to or greater than the
    amount of energy that the building consumes within a year. We believe that this
    may be the first Net Zero Energy / Carbon Neutral fire hall in Canada.

  • Lynn Valley Trail Grand Re-Opening

    Congratulations to the Lynn Valley Trail Association on the Grand Re-Opening of the 7.5km portion of the trail from Decou Road to Prospect St following bridge repairs and trail resurfacing. At a ceremony on October 20th a plaque was revealed at Silver Lake Park in Port Dover paying tribute to the major contributors who donated to the recent trail upgrades. G. Douglas Vallee is honoured to be one of these donors. On a separate occasion at the Memorial Ball Park in Simcoe John Vallee and Ryan Elliott presented the Lynn Valley Trail Association with our contribution.