The reconstruction of Foster Street in Simcoe will involve replacing all sanitary, storm, and water infrastructure, as well as the sidewalk, curb, gutter, and asphalt surfaces. The Vallee municipal engineering team was awarded the contract by Norfolk County and was responsible for pre-design, detailed design, contract administration, and construction inspections. The project is scheduled for construction in 2025.
Client
Location
Simcoe, Ontario
Year
2026
Span
310 metres
Contract Value
$1.2 million