The reconstruction of Regent and McNab Streets in Port Dover will see the replacement of all sanitary, storm, and water infrastructure, as well as the sidewalk, curb, gutter, and asphalt surfaces. The Vallee municipal engineering team was awarded the contract by Norfolk County and was responsible for pre-design, detailed design, contract administration, and construction inspections.

The project is schedule for construction in 2025